How to build a Greenhouse

Recommend  
Page Contents
1: Introduction, Description, Position
2: Sizes, Angles, What you will need
3: Making the base
4: Making the side wall-frames
5: Making the roof sections
6: Erecting the side walls and roof  you are on this page
7: Making the end walls and doors
8: Making the window, The cover
Appendix 60° and 30° Angle patterns
Appendix Photos of finished project
User Photos/Comments

Note: This complete project (all the pages together in one handy pdf file,ad free) can be purchased online and downloaded immediately to your computer for only $5.  Grab here.

To view all available plans in downloadable pdf file click here.

Step 4. Erect the side walls and roof sections

greenhouse frame assembly process

Stand the two side walls upright on the base boards and support them with temporarily props. Fix the bottom plate of the side walls to the base with galvanized nails.

Lift the 5 roof sections in place on top of the side walls.
First position a roof section at each end of the side walls, and then position the other three evenly spaced in between.
Fix the roof frames to the side wall top plate with galvanized nails.

Temporarily prop the two end roof sections plumb (vertical).

Fix the 1 1/2"x 3 1/2" (90mm x 45mm) window support plate against the top of the rafter uprights. (See drawing 4c.)

Nail the 3/4"x7 1/2" (190mmx19mm) fascia board to the top ends of the long rafters as shown in the drawing, making sure all the roof sections are vertical and parallel with each other.
Tuck some galvanized metal window flashing under and behind the fascia board prior to nailing the bottom of the board.

Brace the roof on the side that has no windows with two metal straps running diagonally across the top plane. Nail the straps at the ends and wherever they cross a rafter.